PROJECT: REDLANDS, CA 

A 1,000,000 square foot pad fits right in place with the Earth Basics team. Projects this size can be tricky for some. Land clearing, slope leveling, infrastructure, drainage...no problem!  We started out with a pre-water operation while we mobilized heavy equipment to the site. The equipment used for this site consisted of: (8)- 657 E Caterpillar Model scrapers, (2)- 623 F Cat  Model scrapers, and support equipment consisting of water trucks, an 824 Cat Dozer and a John Deere 772 GP (motorgrader) scraper blade.

 

Before the watering was complete it was time for us to roll. We hit the ground hard, pounding the earth to the required compaction and moisture content including the over excavation as required. Cuts and fills were completed and the pad was being graded to a tolerance of +/- 0.04 to balance. 15 days after we started moving dirt we had a certified pad. Bang! Done! All this was viable utilizing the Earth Basics Advanced Connected Construction Site (ACCS).