PROJECT: MONTE VISTA DISTRIBUTION
CENTER CHINO, CA
At 400,000 sq ft, this project is a typical slam dunk for the team. However, our crew learned the original water source was not going to be available, and we had to improvise.
Time to lay some pipe! Nearly a mile of eight-inch diameter PVC was laid to reach and fill our water tower allowing the fun to begin. After a longer than average site pre-water process, (temperatures had been near or over 100 degrees for weeks), Earth Basics spent 7 work days preparing the subgrades for the site. The pad was certified without any needed corrections and we were again very pleased with the teamwork involved by the clients and the Earth Basics family.
CP1_6567
CP1_6597
CP1_6608
CP1_6567